B&D

Bushfire documentation. Specify the complete BAL-Maze system.

If your project is in a bushfire-prone area, start with its assessed requirements. Our BAL-Maze documents explain the tested sectional-door system and the installation conditions needed for compliance.

What our BAL-Maze documentation covers

Our Panelift sectional door with the proprietary metal labyrinth BAL-Maze system was tested by CSIRO to AS 1530.8.1:2018 and achieved BAL AA40 as described in document 165027_00. The application table lists BAL-12.5, BAL-19, BAL-29 and BAL-40; it does not cover BAL-FZ.

The result applies to the specified door-and-protection system. The compliance document requires installation by a trained installer to our instructions, with the installer signing the compliance label attached to the door. A standard door without the specified system is not the same tested assembly.

Installation and compliance documents

BAL- MAZE

Manual or documentIdentify the right document
Bal-Maze Installation Manual (PDF)Document 165015_07. 5 pages.
Bal-Maze Compliance Documentation (PDF)Document 165027_00. 1 page.

Check the requirements for your site

Use your project’s assessed BAL and the current requirements provided by your building professional. A regional map or a suburb name cannot determine the required BAL for an individual property. We can help your installer or specifier confirm the appropriate door configuration and supporting documentation.

Explore the BAL-Maze door system · Discuss your project with us

Safe as Can B&D BAL Maze Sectional Door BAL Rating
Our BAL-Maze application overview. Use the complete compliance document and your project’s assessed BAL.

Images on This Page